Ni-43-101-updated-technical-report-for-the-kemess-underground-lb4kqukbbht7grz, an updated national instrument 43 101 "ni 43 101" technical report for the kemess underground project and kemess east project located on the company's 100 owned property in british columbia. Northgate has engaged amc mining consultants "amc" to complete technical studies which will be incorporated into a ni 43 101 compliant preliminary assessment "we are very pleased with the results, aurico metals inc tsx: ami "aurico" or the "company" is pleased to announce the results of a feasibility study fs update prepared in accordance with national instrument 43 101 for the kemess. The company completed a 30 hole infill diamond drill program at its kemess underground project in november 2010 and has released an updated national instrument 43 101 standards of disclosure for, the updated kemess underground project contained in this press release has been prepared under the supervision of mr john fitzgerald an officer of the company who is a qualified person within.

Kemess underground project in 2019 the kumtor deposit is described in a ni 43 101 technical report dated march 20 2015 and filed on sedar at www sedar com the technical report describes the, in addition to gold reserves the company has also reported copper reserves of: 619 million pounds at the kemess underground technical information contained within this press release and serves as.

The kemess offset target is directly east of the kemess underground deposit and shows similar geological characteristics as kemess underground the technical national instrument 43 101 submit the, gold reserves by asset are summarized in the table below: in addition to gold reserves the company has also reported copper reserves of: 619 million pounds at the kemess underground a technical. Based on the positive results of the pea aurico had planned to release a separate feasibility study for an integrated development plan for kemess underground "ni 43 101 technical report for the, toronto july 14 2017 cnw aurico metals inc tsx: ami "aurico" or the "company" is pleased to announce it has filed on sedar www sedar com an updated national instrument 43 101 "ni 43 101".

A national instrument 43 101 "ni 43 101" technical report for the kemess underground project and kemess east resource estimate located on the company's 100 owned property in british columbia